When using the Time-Cost Critical Path Method (CPM) Scheduling Model to "crash" a project, you know when you have arrived at the optimal solution when _____.
a) You have found the critical path
b) You have run out of crash time
c) You no longer have a linear relationship with costs
d) You have reached the minimum total cost
e) You have run out of crash costs

Answers

Answer 1

Answer:

a) You have found the critical path

Explanation:

The Time Cost Critical Path Method(CPM) in project management works by adding up/calculating duration of all tasks/activities in the project in order to find the longest time possible to complete the project. It is a method to estimate project duration using a flow chart that shows a network of tasks and estimated duration(start and finish times). The critical path is reached when project time is at the maximum/longest time of completion.


Related Questions

Stock Rit Rmt ai Beta
A 10.6 15     0 0.8
Z  9.8 8 0 1.1

Rit = return for stock i during period t
Rmt = return for the aggregate market during period t

What is the abnormal rate of return for Stock Z during period t using only the aggregate market return (ignore differential systematic risk)?

a. 3.40
b. 4.40
c. 1.80
d. -4.40

E.
-1.70

Answers

Answer:

1.8 option c

Explanation:

this question has a very simple solution

the following definitions

Rit = return for stock i during period t

Rmt = return for the aggregate market during period t

The abnormal rate of return for stock z is = Rit - Rmt

Rit = 9.8

Rmt = 8

9.8 - 8 = 1.8

therefore the abnormal rte of return for stock z is = 1.8, which is option c

MacKenzie Company sold $400 of merchandise to a customer who used a Regional Bank credit card. Regional Bank deducts a 2.0% service charge for sales on its credit cards and credits MacKenzie's account immediately when sales are made. The journal entry to record this sale transaction would be:

Answers

Answer:

Date                         Account Title                               Debit                  Credit

XX-XX-XXXX          Cash                                             $392

                                Credit card service charge         $   8

                                Sales                                                                        $400

Working

Cash :

= 400 * (1 - 2% service charge)

= $392

Credit card service charge:

= 400 * 2%

= $8

packaging materials for processed​

Answers

Answer:

Types of packaging material used in food

Plastics. Plastics are organic polymeric materials that can be molded into the desired shape. ...

Metals (steel, tin, aluminum) The main use of these metals is the preservation of canned foods and beverages. ...

Glass. ...

Wood, cardboard and papers. ...

Advances in packaging techniques.

In recent decades there have been fewer trade blocs established to promote regional economic integration. True False

Answers

Answer: False

Explanation:

Trade bloc refers to an intergovernmental agreement, whereby the barriers to trade are eliminated among the countries that are involved.

The statement that "in recent decades there have been fewer trade blocs established to promote regional economic integration" is false.

There has been an increase in trade blocs in recent decades such as Brazil, Russia, India, China, and South Africa(BRICS), North American Free Trade Agreement(NAFTA), Association of Southeast Asian Nations( ASEAN).

They all promote economic development.

You own a portfolio equally invested in a risk-free asset and two stocks. One of the stocks has a beta of 1.25 and the total portfolio is equally as risky as the market. What must the beta be for the other stock in your portfolio?

Answers

Answer:

The answer is "1.75"

Explanation:

The portfolio is equally weighted with three parts, which each weighs 33,33%. The risk-free asset (Rf) is available worldwide and beta 0 is given for the market portfolio.

[tex]Return \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ Beta \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ Probability (Pi)\\\\\text{Risk free Return (Rf)} \ \ \ \ \ \ \ \ \ \ \ 0 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 33.33\%\\\\Stock 1\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1.25 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 33.33\%\\\\Stock 2\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ? \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 33.33\%\\\\[/tex]

[tex]\text{Portfolio Beta = (Pi Rf * Beta Rf) + (Pi Stock1 * Beta Stock1) + (Pi Stock2 * Beta Stock2)}\\\\1 = (33.33\% \times 0) + (33.33\% \times 1.25) + (33.33\% \times x)\\\\1 = 0 + 0.416625 + 0.3333x\\\\1 - 0.416625 = 0.3333x\\\\0.583375 = 0.3333x\\\\x =\frac{0.583375}{0.3333}\\\\x = 1.75[/tex]

For each of the following events, explain the short-run and long-run effects on output and the price level, assuming open economy and that policymakers take no action.

a. The stock market declines sharply, reducing consumers’ wealth.
b. The federal government increases spending on national defense.
c. A technological improvement raises productivity.
d. A recession overseas causes foreigners to buy fewer U.S. goods.

Answers

Answer:

High prices of products as well as increases poverty.  

Explanation:

The stock market declines sharply, reducing consumers’ wealth that leads to high prices of products as well as increases poverty.  The federal government increases spending on national defense that decreases the foreign reserves and money for other fields of the country. A technological improvement raises productivity which increases the economy of the country as well as standard of living. A recession overseas causes foreigners to buy fewer U.S. goods that leads to lower income of the country and purchasing power of the country. Due to this, there is less money for other fields and institutions.

Answer:

b. The federal government increases spending on national defense.

Explanation:

Hope this helps

In this market, the equilibrium hourly wage is $ , and the equilibrium quantity of labor is thousand workers. Suppose a senator introduces a bill to legislate a minimum hourly wage of $6. This type of price control is called a .

Answers

Answer:

The equilibrium hourly wage is the wage where the curve of supply of labor intersects with that of the demand for labor. The same goes for the equilibrium quantity of labor.

The equilibrium hourly wage is $10, and the equilibrium quantity of labor is 450 thousand workers.

If a Senator introduces a minimum hourly wage, this is considered a Price Floor.

Price floors are prices that that the government mandates that one cannot charge below for a good or service. If there is a price floor on cake for instance, a person is not allowed to charge less than that price floor for cake. The Senator's bill is therefore saying that people should not be paid less than $6 an hour.

A second-year MBA student, takes three hours off one evening and uses his car to go to a movie with a friend. A ticket to the movie costs Josh $5, gasoline for the trip costs $1, and Josh passed up tutoring a student that night at $10 an hour. He could also have used the three hours to work as a grader for a professor at $15 an hour. What is Joshâs economic cost of going to the movie?

Answers

Answer:

$-39

Explanation:

Economic cost is implicit cost less accounting cost

Implicit cost or opportunity cost : implicit cost is the cost of the next best option forgone when one alternative is chosen over other alternatives. It is used in calculating economic profit

There are two opportunities the student forgoes when he decides to go to the movies. They are, the amount he would have earned if he tutored the student which has a value of $10 / hour and the amount he would have earned working as a grader which is $15 / hour.

The next best option is $15 / hour because it has a higher value

total economic cost = 15 x 3 = 45

the cost of the ticket and the cost of gasoline are explicit costs

Explicit cost includes the amount expended in going to the cinema

6 - 45 = -39

The Cavy Company accumulated
560 hours of direct labor on Job 345
800 hours of direct labor on Job 777
The direct labor incurred at a rate of:
$20 per direct labor hour for Job 345
$21 per direct labor hour for Job 777
Journalize the entry and record the flow of labor costs in production.

Answers

Answer:

Date  Journal Entry                  Debit       Credit

         Work in Process            $28,000

         ((560*$20) + (800*$21)

               Wages payable                        $28,000

        (To record the flow of labor costs in production)

Investors require an after-tax rate of return of 10% on their stock investments. Assume that the tax rate on dividends is 30% while capital gains escape taxation. A firm will pay a $2 per share dividend 1 year from now, after which the firm's stock is expected to sell at a price of $30.

Required:
a. Find the current price of the stock.
b. Find the expected before-tax rate of return for a 1-year holding period.
c. Now suppose that the dividend will be $3 per share. If the expected after-tax rate of return is still 10%, and investors still expect the stock to sell at $20 in 1 year, at what price must the stock now sell?
d. What is the before-tax of return? Why is it now higher than in part (b)?

Answers

Answer:

a. $28.5

b. 12.28%

c.  $29.18

d. 13.09%

Explanation:

a. let current price = p

p*1.10 = 2(1-0.3)+30

= 1.4+30/1.10

= 31.4/1.10

= 28.5

the current price of the stock is approximately 28.5 dollars

b. (30+2 /28.5)-1

= 32/28.5 - 1

= 0.1228

= 12.28%

expected before tax rate is 12.28%

c. 3(1-0.3)+30 / 1.10

= 3*0.7+30/1.10

= $29.18

d. before tax rate of return

= (3$ + 30-29.18)/29.18

= 0.1309

= 13.09%

it is now higher here given that given that a greater dividend causes more tax burden.

Which of the following is NOT an accurate description of modern marketing?

Marketing involves managing profitable customer relationships.

Marketing involves satisfying customers' needs.

O Marketing is the creation of value for customers.

Marketing emphasizes selling and advertising exclusively.

O Marketing is building value-laden exchange relationships with customers.

Answers

I'm stuck between

Marketing is the creation of value for customers and

Marketing emphasizing selling and advertising exclusively l.

Onslow Co. purchases a used machine for $178,000 cash on January 2 and readies it for use the next day at a $2,840 cost. On January 3, it is installed on a required operating platform costing $1,160, and it is further readied for operations. The company predicts the machine will be used for six years and have a $14,000 salvage value. Depreciation is to be charged on a straight-line basis. On December 31, at the end of its fifth year in operations, it is disposed of.
Required:
1. Prepare journal entries to record the machine’s purchase and the costs to ready and install it.
Cash is paid for all costs incurred.
2. Prepare journal entries to record depreciation of the machine at December 31 of (a) its first year in operations and (b) the year of its disposal.
Prepare journal entries to record the machine’s disposal under each of the following separate assumptions: (a) it is sold for $15,000 cash; (b) it is sold for $50,000 cash; and (c) it is destroyed in a fire and the insurance company pays $30,000 cash to settle the loss claim.

Answers

Answer:

Onslow Co.

Journal Entries:

1. Jan. 2: Debit Equipment $178,000

Credit Cash $178,000

To record the cash payment for equipment purchase.

2. Jan. 3: Debit Equipment $4,000

Credit Cash $4,000

To record the cash payment for readying the equipment for use.

3. Dec. 31: Debit Depreciation Expense $28,000

Credit Accumulated Depreciation $28,000

To record depreciation expense for the first year.

4. Dec. 31, Year 5: Debit Equipment Disposal$178,000

Credit Equipment $178,000

To transfer the equipment account to the Equipment Disposal account.

Debit Accumulated Depreciation $140,000

Credit Equipment Disposal $140,000

To transfer accumulated depreciation to the Equipment Disposal account.

a) Debit Cash $15,000

Credit Equipment Disposal $15,000

To record the cash proceeds from sale of equipment.

Debit Loss on Sale of Equipment $23,000

Credit Equipment Disposal $23,000

To record the loss on Equipment Disposal.

b) Debit Cash $50,000

Credit Equipment Disposal $50,000

To record the cash proceeds from sale of equipment.

Debit Sale of Equipment $12,000

Credit Gain on Sale of Equipment $12,000

To record the gain on Equipment Disposal.

c) Debit Cash $30,000

Credit Equipment Disposal $30,000

To record the cash proceeds from insurance company.

Debit Loss on Disposal $8,000

Credit Equipment Disposal $8,000

To record the loss on Equipment Disposal.

Explanation:

a) Data and Calculations:

January 2: Cost of used machine = $178,000

January 3: Readying costs = $4,000 ($2,840 + $1,160)

Estimated useful life = 6 years

Estimated salvage value = $14,000

Depreciable amount = $168,000 ($182,000 - $14,000)

Depreciation method = straight-line method

Annual depreciation expense = $28,000 ($168,000/6)

Accumulated depreciation at December 31, Year 5 = $140,000 ($28,000*5)

Disposal date = December 31, Year 5

Journal Entries Analysis:

1. Jan. 2: Equipment $178,000 Cash $178,000

2. Jan. 3: Equipment $4,000 Cash $4,000

3. Dec. 31: Depreciation Expense $28,000 Accumulated Depreciation $28,000

4. Dec. 31, Year 5: Equipment Disposal $178,000 Equipment $178,000

Accumulated Depreciation $140,000 Equipment Disposal $140,000

a) Cash $15,000 Equipment Disposal $15,000

Loss on Sale of Equipment $23,000 Equipment Disposal $23,000

b) Cash $50,000 Equipment Disposal $50,000

Equipment Disposal $12,000 Gain on Sale of Equipment $12,000

c) Cash $30,000 Equipment Disposal $30,000

Loss on Disposal $8,000 Equipment Disposal $8,000

A French family flies from Paris, France to New York City where they have a brief layover before flying to Montreal, Canada. While in New York the family has a $25 dollar lunch at a hot dog stand near Time Square. How does this lunch contribute to U.S. GDP?
a. U.S. GDP remains unchanged, but French GDP increases by 22 Euros ($25 U.S.).
b. GDP decreases by $25
c. GDP increases by $25
d. GDP does not change since the family is not from the U.S.

Answers

Answer:

C

Explanation:

Gross domestic product is the total sum of final goods and services produced in an economy within a given period which is usually a year

GDP calculated using the expenditure approach = Consumption spending by households + Investment spending by businesses + Government spending + Net export

Consumption spending includes spending by households on goods and services. Consumption spending includes :  

spending on durables - e.g. buying a laptop  

spending on nondurables - e.g. buying clothes, food

spending on services  - e.g. payment of hospital bill  

the purchase of a textbook by a student is an example of consumption spending on durable goods

Investment - It includes purchases of goods and services made by businesses in the production of goods and services

Government spending - It includes government consumption expenditure and gross investment.  The purchase of a new  limousine for the president is an example of consumption expenditure

Net export = export  - import

the purchase of hotdog constitutes consumption of non durable goods and this would increase US GDP by $25

Dozier Company produced and sold 1,000 units during its first month of operations. It reported the following costs and expenses for the month:

Direct materials $86,000
Direct labor $43,500
Variable manufacturing overhead $21,800
Fixed manufacturing overhead 33,100
Total manufacturing overhead $54,900
Variable selling expense $15,400
Fixed selling expense 24,800
Total selling expense $40,200
Variable administrative expense $5,700
Fixed administrative expense 28,400
Total administrative expense $34,100

Required:
a. What is the total product cost?
b. What is the total period cost?

Answers

Answer:

Results are below.

Explanation:

The product costs are all the expenses incurred in production being direct and indirect:

Direct materials= 86,000

Direct labor= 43,500

Variable manufacturing overhead= 21,800

Fixed manufacturing overhead= 33,100

Total product cost= $184,400

The period costs are all the expenses not involved in production (selling and administrative):

Variable selling expense= 15,400

Fixed selling expense= 24,800

Variable administrative expense= 5,700

Fixed administrative expense= 28,400

Total period cost= $74,300

Bob agreed to tutor Lola in Spanish for two (2) hours and Lola agreed to pay $25.00 per hour for the tutoring services. Bob tutored Lola and she paid Bob $50.00. This means that the parties have been _____.

Answers

Answer: discharged by performance

Explanation:

When parties to a contract are discharged from their duties as per the contract, it means that they are no longer party to the agreement. When this is done by performance, it means that the discharge was done because both parties have fulfilled the demands of the contract.

Bob agreed to tutor Lola for two hours and Lola agreed to pay Bob $50 for that. Bob then tutored her for the two hours and was paid the amount. The parties have therefore fulfilled their obligations to each other and so the contract has been satisfied.

During the year, Wright Company sells 500 remote-control airplanes for $120 each. The company has the following inventory purchase transactions for the year. Date Transaction Number of Units Unit Cost Total Cost Jan. 1 Beginning inventory 40 $ 68 $ 2,720 May. 5 Purchase 270 71 19,170 Nov. 3 Purchase 220 76 16,720 530 $ 38,610 Calculate ending inventory and cost of goods sold for the year, assuming the company uses specific identification. Actual sales by the company include its entire beginning inventory, 250 units of inventory from the May 5 purchase, and 210 units from the November 3 purchase.

Answers

Answer:

Wright Company

Cost of goods sold = $36,430

Ending inventory = $2,180

Explanation:

a) Data and Calculations:

Date   Transaction            Number of Units    Unit Cost     Total Cost

Jan. 1   Beginning inventory           40                   $ 68          $ 2,720

May. 5 Purchase                          270                        71             19,170

Nov. 3 Purchase                          220                       76            16,720

Total available for sale               530                                     $ 38,610

Specific identification of Sales of 500 units:

Cost of goods sold:

Jan. 1   Beginning inventory           40                   $ 68          $ 2,720

May. 5 Purchase                          250                       71             17,750

Nov. 3 Purchase                           210                       76            15,960

Total                                             500                                    $36,430

Cost of goods sold = $36,430

Ending inventory:

May. 5 Purchase                          20                       71         $1,420

Nov. 3 Purchase                           10                       76             760

Total                                             30                                   $2,180

Ending inventory = $2,180

Around the world oil is priced consistently in United States dollars. In economic terms this is an example of:

Answers

Answer: unit of account

Explanation:

The unit of account is function of money which refers to the standard monetary unit of measurement of a good or service.

Since oil is priced consistently in United States dollars around the world, this means that dollars is the standard monetary unit of measurement and is therefore, the unit of account.

Aug. 1 Madison Harris, the owner, invested $10,250 cash and $44,075 of photography equipment in the company.
2 The company paid $3,900 cash for an insurance policy covering the next 24 months.
5 The company purchased office supplies for $1,948 cash.
20 The company received $3,050 cash in photography fees earned.
31 The company paid $866 cash for August utilities.
Prepare general journal entries for the above transactions.

Answers

Answer and Explanation:

The journal entries are shown below:

(i) On August 1,

Cash A/c Dr. $10,250

photography equipment A/c Dr. $44,075  

              To common stock   $54,325

(Being the issuance of common stock for cash and photography equipment is recorded)

(ii) On August 2,

Prepaid insurance A/c Dr. $3,900

           To cash $3,900

(Being the cash paid in advance for insurance is recorded)

(iii) On August 5,

Office supplies A/c Dr. $1,948

           To cash                       $1,948

(Being the cash paid for office supplies is recorded)

(iv) On August 20,

Cash A/c Dr. $3,050

     To photography fees earned $3,050

(Being the photography fees earned is recorded)

(v) On August 31,

Utilities A/c Dr. $866

      To cash A/c    $866

(Being the cash paid for utilities)

The SRT partnership agreement specifies that partnership net income be allocated as follows in the following order: Partner S Partner R Partner TSalary allowance $20,000 $25,000 $15,000Interest on avg. capital balance 10% 10% 10%Remainder 30% 30% 40%Average capital balances for the current year were $60,000 for S, $50,000 for R, and $40,000 for T.Refer to the information given. Assuming no restrictions and current year net income of $45,000, what amount should be allocated to each partner? Partner S Partner R Partner TA) $17,000 $21,000 $7,000B) ($9,000) ($9,000) ($12,000)C) $13,500 $13,500 $18,000D) $22,500 $22,500 $0

Answers

Solution :

Note 1

calculation of remaining income after distribution of salary and interest on capital.

Total Net Income                                             $ 45,000

Less : Salary allowance                                   $ 60,000

($20,000 + $25,000 + $15,00)

Less : Interest on capital                                 $ 15,000

($ 6,000 + $ 5,000 + $ 4,000)

Remaining income / (loss) to be allocated    $ 30,000

Since the remaining income is negative, i.e. it loss to the SR partnership, so such Loss will also be allocated to the partners. Since in a partnership, Partners are required to share profits as well as losses. Hence, such loss will be deducted from the other shares.

Scheduled of amount allocated to each partner

                                                          Partners S      Partner R        Partner T

a). Salary allowance allocated          $ 20,000        $ 25,000       $ 15,000

b). Interest on average capital            $ 6000          $ 5000          $ 4000

    balance allocated.

c). Remaining income allocated       $ 9000           $ 9000          $ 12,000

Total allocation (a + b - c)  :                $ 17,000        $ 21,000        $ 7,000

Profit margin is synonymous with the term _______ and tells whether or not total profit will be positive.

Answers

Answer: Average profit

Explanation:

Both average profit and profit margin show the percentage of profit that a company can expect to receive from $1 worth of sales. It is calculated by dividing the profits by the sales figure,

If sales are $10 and profits are $3, the profit margin would be:

= 3/10

= 30%

This means that for every $1 of sales, there is $0.30 in profit. This method shows us whether the total profit will be negative or positive by showing us individual product profit.

Following is information from Skechers USA, Inc. for fiscal 2016 (in thousands).
Total 2016 revenue $3,563,311
Total revenue growth rate 5.0%
Terminal revenue growth rate 2%
Net operating profit margin (NOPM) 8.2%
Net operating asset turnover (NOAT)3.42
Projected 2017 total revenue would be:
A. $3,634,577 thousand.
B. $3,855,503 thousand.
C. $3,324,568 thousand.
D. $3,741,477 thousand.
E. None of the above.

Answers

Answer:

D. $3,741,477 thousand

Explanation:

Calculation to determine what total revenue would be:

Total value=$3,563,311 million ×(1+.05)

Total value=$3,563,311 million × 1.05

Total value = $3,741,477 thousand

Therefore total revenue would be:$3,741,477 thousand

Suppose a basketball player has made 294 out of 359 free throws. If the player makes the next 3 free throws, I will pay you $20. Otherwise you pay me $26. Step 1 of 2 : Find the expected value of the proposition. Round your answer to two decimal places. Losses must be expressed as negative values.

Answers

Answer: -$0.74

Explanation:

Expected value of the proposition is:

= (Probability that player makes next 3 free throws * 20) - (Probability that player does not make the next 3 free throws * 26)

Probability that player does not make the next 3 free throws  = 294/359 * 294/359 * 294/359

= 0.549235557

Expected value of proposition:

= (0.549235557 * 20) - ( (1 - 0.549235557) * 26)

= 10.98471114 - 11.719875518

= -$0.74

Since nominal wages were constant as the price level changed, you explain that a decrease in the price level leads to an __________, which leads to firms ________

Answers

Answer:

increase in real wages, hiring less workers

Explanation:

In the case when the nominal wages are remain same but at the same time the level of the price should changed so if there is an decrease in the level of the price so that means there is an increased in the real wages as it is an inverse relationship between the real wages and the price level due to this the firm could hired less workers as the wages are increased

Lãi suất tiền gửi và cho vay của Việt nam hiện tại là bao nhiêu?

Answers

Answer:

?????

Explanation:

Nick’s Novelties, Inc., is considering the purchase of new electronic games to place in its amusement houses. The games would cost a total of $475,000, have a fifteen-year useful life, and have a total salvage value of $47,500. The company estimates that annual revenues and expenses associated with the games would be as follows: Revenues $ 240,000 Less operating expenses: Commissions to amusement houses $ 70,000 Insurance 45,000 Depreciation 28,500 Maintenance 30,000 173,500 Net operating income $ 66,500 Required: 1a. Compute the payback period associated with the new electronic games. 1b. Assume that Nick’s Novelties, Inc., will not purchase new games unless they provide a payback period of five years or less. Would the company purchase the new games?

Answers

Answer:

     a. 5 years

     b. Yes they will because the payback period is 5 years.

Explanation:

a. Payback period

First calculate the annual cash inflow:

= Net income + Depreciation

= 66,500 + 28,500

= $95,000

The investment cost was $475,000

Payback period = Investment cost / Annual cash inflow

= 475,000 / 95,000

= 5 years

b. The company will purchase the games because they have a payback period of 5 years.

Under variable costing, fixed manufacturing overhead is: Multiple Choice applied directly to Work-in-Process Inventory. expensed immediately when incurred. never expensed. treated in the same manner as variable manufacturing overhead.

Answers

Answer: expensed immediately when incurred.

Explanation:

Under variable costing, only variable costs can be apportioned to the product as product costs. This means that fixed costs have to be expensed immediately they are incurred so that they do not feature in the product costs.

It is not a widely used principle as both U.S. GAAP and IFRS don't allow for its use in financial statements. They prefer absorption costing where fixed costs are apportioned to the products created.

The following data relate to a company that produces and sells a travel guide that is updated monthly: Each book sells for $20.00. The company sold 8,000 books in June and 10,000 books in July. The unit contribution margin per book is:

Answers

Answer:

10.30

Explanation:

20

8000

160 000 June

10000

200 000 July

20 - 3.20 -4 - .50 -2 = 10.30

costs:Printing and binding...............................$3.20 per copyBookstore discounts................................$4.00 per copySalespersons’ commissions....................$0.50 per copyAuthor’s royalties...................................$2.00

Charles Corporation produces and sells a single product. Data concerning that product appear below:
Per Unit Percent of Sales
Selling Price $190 100%
Variable Expenses 38 20%
Contribution Margin 152 80%
Fixed expenses are $87,000 per month. The company is currently selling 1,000 units per month. Management is considering using a new component that would increase the unit variable cost by $28. Since the new component would increase the features of the company's product, the marketing manager predicts that monthly sales would increase by 500 units. What should be the overall effect on the company's monthly net operating income of this change?

Answers

The answer is no o 872 because

Suppose velocity is constant, but real GDP is not independent of the money supply. If this is the case, a 10 percent increase in the money supply will:

Answers

Answer: d. have an unpredictable effect on inflation.

Explanation:

Changes in money supply affect inflation with an increase in money supply causing inflation to rise and a decrease calling inflation to fall. Real GDP is supposed to be independent of the money supply as it is not meant to be affected by inflation.

If a situation arises where real GDP is not actually independent of the money supply then that means that it is not independent of inflation either. Should the money supply therefore rise, the effect on the prices of goods and services (real GDP) in the economy will be unpredictable as it might go either way.

The cost of capital for a firm with a 60/40 debt/equity split, 4.86% cost of debt, 15% cost of equity, and a 35% tax rate would be:______.

Answers

Answer: 7.9%

Explanation:

The weighted cost of capital for a firm shows the cost of capital from all sources that fund the business including stock and long term liabilities.

Formula is:

= (Weight of equity * cost of equity) + (Weight of debt * (cost of debt * (1 - tax rate) ))

= (0.4 * 0.15) + ( 0.6 * ( 0.0486 * ( 1 - 35%)))

= 0.06 + 0.018954

= 7.895%

= 7.9%

Other Questions
how many meters are there in 50 foots On May 1, a two-year insurance policy was purchased for $12,000 with coverage to begin immediately. What is the amount of insurance expense that would appear on the company's income statement for the first year ended December 31 Zero is not a real number True or False why is human development index necessary? I need help ASAP !!!! who do you think helped african americans gain civil rights and explain why they were important? The condition of muscle fatigue is best explained by: Question 1 options: insufficient intracellular quantities of ATP due to excessive consumption the inability to generate sufficient quantities of ATP due to feedback regulation of synthesis the all or none law lack of intracellular calcium Joan has raised $306 by selling 34 equally priced boxes of chocolate for the team fund-raiser. Which of the following equations can be used to find the price, n, of each box of chocolate? n 34 = 306 34n = 306 n 34 = 306 n + 34 = 306 What happened on January 15, 1991? Solve the simultaneous equations6x+2y=125x+2y=8 Cmo transformamos las fuentes de energa renovable en energa elctrica necesarias para el desarrollo sostenible de nuestro pas? Adam borrowed $5,600 from the bank. The bank charges 4.2% simple interest each year.Which equation represents the amount of money in dollars, x, Adam will owe in one year, if no payments are made?x=5,600+5,600(42)(12)x=5,600+5,600(0.042)(1)x=5,600+5,600(42)(1)x=5,600+5,600(0.042)(12) Some non-communicable diseases are caused by bad habits like smoking and drinking alcohol. Explain about any two diseases caused by these bad habits. OR Anuj was suffering from chicken pox. His mother did not allow his sister Kavita to play with him during his period of illness. She also kept separate utensils to serve food for him. What could be the reason for this? OR Which of the following is NOT part of the micro-environment politicssocial interactiontechnological know-how Judy, a 28 y/o, presents to the clinic with a fever, vaginal discharge, and pain in the lower abdomen, pelvis, and lower back. These symptoms are accompanied by chills, nausea, and vomiting. This presentation is most typical of: Which of the statements proves that the lines a and b are parallel? classify each of the following solids as ionic,metallic, molecular, network (covalent)or amorphous?1) Tetra phosphorous deicide(P4O10)2)Graphite3) Ammonium phosphate (NH4)3po44) Brass5)SiC6)Rb7)l28)LiBr9)P410) Plastic11)Si Need answer urgently work out 1 2/3 x 1 1/5pls give the full answer with working out{NOTE:the 2/3 and the 1/5 are fractions and the 1's are the whole numbers} Copper reacts with sulfuric acid to yield copper(II) sulfate, water, and sulfur dioxide.a. Trueb. False