Due to construction delays on the trip from Little Rock to Chicago, a van driver averaged 48 miles each hour. About how long did that trip take?

Answers

Answer 1
from chicago to little rock is 9 hours and 30 mins so the answer should be 432 miles without the 30 mins but with it; it’s 456 miles

Related Questions

The sanctuary takes out a $12,500 loan to renovate its gift shop. At 5%
simple interest, how much would the sanctuary need to pay back in total after 10 years?

Answers

Answer:

20361.18283

Step-by-step explanation:

p(1+r/100)n

12500(1+5/100)power 10

i hope this answer helps a little bit.

The circumference of a tree trunk is 50 ft

Answers

Answer:

So the length will be the same as the length of the torso

PLZ SOMEONE HELP RIGHT AWAY!

10x+2(8x+10)

Answers

2(13x+10) is the answer

Answer:

26x+20

Step-by-step explanation:

The results of a series of surveys revealed a population with a mean of 4.73 and a standard deviation of 0.865. If each survey has a sample size of 200, which value falls within the interval where 95% of the sample means occur? A. 4.88 B. 4.63 C. 4.91 D. 4.55

Answers

Answer:

4.63

Please give me brainliest, I really need it.

The value of 4.63 falls within the interval (4.66, 4.791) where 95% of the sample means occur option (B) is correct.

What is a confidence interval for population standard deviation?

It is defined as the sampling distribution following an approximately normal distribution for known standard deviation.

The formula for finding the confidence interval for population standard deviation as follows:

[tex]\rm s\sqrt{\dfrac{n-1}{\chi^2_{\alpha/2, \ n-1}}} < \sigma < s\sqrt{\dfrac{n-1}{\chi^2_{1-\alpha/2, \ n-1}}}[/tex]

Where s is the standard deviation.

n is the sample size.

[tex]\chi^2_{\alpha/2, \ n-1} and \chi^2_{1-\alpha/2, \ n-1}[/tex]  are the constant based on the Chi-Square distribution table.

α is the significance level.

σ is the confidence interval for population standard deviation.

Calculating the confidence interval for population standard deviation:

We know significance level = 1 - confidence level

 

It is given that:

Mean of the population x = 4.73

Standard deviation s = 0.865

Sample size n = 200

The interval where 95% of the sample means occur:

Lower limit = 4.73 - 0.865/√200

Lower limit = 4.66

Upper limit = 4.73 + 0.865/√200

Upper limit = 4.791

The interval = (4.66, 4.791)

Thus, the value of 4.63 falls within the interval (4.66, 4.791) where 95% of the sample means occur option (B) is correct.

Learn more about the confidence interval here:

brainly.com/question/6654139

#SPJ2

A line passes through the point (8, 7) and has a slope of 5/4 Write an equation in slope-intercept form for this line.

Answers

the equation is y = 5/4x - 3

Anyone know the answer to this ?

Answers

Answer:

no srry

Step-by-step explanation:

153 oz to ___lbs ____oz

Answers

Answer:

153 oz to 9.5625 lbs

Step-by-step explanation:

You can round 9.5625 lbs to 8 or just say 9.5

HELP I NEED HELP ASAP
HELP I NEED HELP ASAP
HELP I NEED HELP ASAP
HELP I NEED HELP ASAP
HELP I NEED HELP ASAP

Answers

Answer: a

Step-by-step explanation:

The radius of a circle is 4 centimeters. What is the area of a sector bounded by a 135 degrees arc?

Answers

Answer:

The answer is 0.235619449 rad m.

What is the data range of the data below 625, 638, 619, 677, 638, 659

Answers

Answer:

58

Step-by-step explanation:

The range is the difference between the highest and the lowest numbers in the number set.

The highest number in this set is 677 and the lowest number is 619.

677 - 619 = 58

Isabella has 63 hair bows. Isabella's sister has h more hair bows than Isabella. Choose the expression that shows how many hair bows Isabella's sister has.

Answers

Answer:

(h+63)

Step-by-step explanation:

Given that,

Isabella has 63 hair bows.

Isabella's sister has h more hair bows than Isabella. It means,

Isabella's sister = h+63

h and 63 are added as Isabella's sister has h more hair bows than Isabella.

Hence, the expression would be (h+63).

In the triangle MSA, MS = 17 and MA = 8. What is the value of angle S, to the nearest degree?

Answers

Answer:

B. 28 degrees

Step-by-step explanation:

4) What is the probability to draw a black checker from a bag of 6 black
checkers and 4 red checkers, replacing it and drawing another black checker.

Answers

Step-by-step explanation:

Divide the number of events by the number of possible outcomes. This will give us the probability of a single event occurring. In the case of rolling a 3 on a die, the number of events is 1 (there's only a single 3 on each die), and the number of outcomes is 6.

Maria is solving this number riddle by using guess and check: Fifteen less than a number is twelve.
Based on the riddle, which statements must be true? Check all that apply.

Answers

Answer:

27

Step-by-step explanation:

x-15=12

x=15+12

x=27

Answer:

27

Step-by-step explanation:

What is the length of one side of a cube that has a surface area of 1,734 square mm?

Answers

Answer:

a = 17

Step-by-step explanation:

1,734 = 6a^2

1,734/6 = 6a^2/6

[tex]\sqrt{289}[/tex] = [tex]\sqrt{a^2}[/tex]

a = 17

Answer:

side = 17 mm

Step-by-step explanation:

1734/6 = 289

√289 = 17 mm

In ΔMNO, the measure of ∠O=90°, NO = 1.8 feet, and OM = 3.6 feet. Find the measure of ∠M to the nearest tenth of a degree.

Answers

Answer- 26.6°
Explanation- tan-1(1.8/3.6)=26.56°

Answer:26.6

Step-by-step explanation:

delta math right ?

Which set of ordered pairs represents y as a function of x?

Answers

Answer:

D is the correct answer

Explanation:

the following function satisfies each output to its input for the set D

f(x)=x/2

let's check each pair:

0/2=0

-1/2=-0.5

-2/2=-1

-3/2=-1.5

-4/2=-2

the reason why A, B, and C can't be pairs of inputs and outputs x and y it's because a variable x can't have more than one y (that's a behaviour of an equation not a function!)

- in A x=-1 | y=2, -2 and this wrong

- in B x=3 | y=9, 16 and this wrong

- in C x=0 | y=0, 1 and this wrong

I hope this was helpful

What is the area of the trapezoid?

Answers

Answer:

26 this is because 4x5=20 then add the triangle which is 3x4 ÷ 2 equalling 26

Answer:

Step-by-step explanation:

(5+8)/2 = 13/2 = 6.5

6.5*4 = 26m²

The formula for the area of a trapezoid is the same as a trapezium :

(a+b)/2 *h = Area

Which number, when raised to the power of 5, equals 2?

Answers

Answer:

1.148698

Step-by-step explanation:

The number that will be equal to 2 when raised to the power of 5 is 1.1487.

When raising a particular number to the power of another, It implies that we are multiplying that particular number in the number of places with which the power is being raised.

From the given information:

Let the unknown number be x;

SO;

x⁵ = 2

We will need to determine the fifth root of 2 in order to eliminate the power of 5 in x.

i.e

[tex]\mathbf{ \sqrt[5]{x^5}=\sqrt[5]{2} }[/tex]

[tex]\mathbf{ x=\sqrt[5]{2} }[/tex]

x = 1.1487

Therefore, we can conclude that the number that will be equal to 2 when raised to the power of 5 is 1.1487.

Learn more about the square root here:

https://brainly.com/question/17309565?referrer=searchResults

Which description can be written as the expression StartFraction 8 Over 21 n EndFraction?

Answers

Answer: It is the quotient of 21 times and number and 8.

Answer:

The answer is "A"

Step-by-step explanation:

please make me b r a i n l i e s t thx

44 students decided to take a cupcake, and 33 of them picked vanilla. What percentage of the students picked

Answers

Answer:

33.33%

Step-by-step explanation:

Given data

Total number of students= 44

Number of students that picked vanilla= 33

Therefore the percentage that picked vanilla is

=44-33/44*100

=11/33*100

=0.3333*100

=33.33%

Hence the percentage is 33.33%

What is the area of a rectangular shaped yard enclosed by a fence that is 35 feet along the North side and 20 feet along the west side?

Answers

Answer:

700 ft

Step-by-step explanation:

35ft x 20ft = 700ft

I’m really confused can anyone help :(

Answers

Answer:

$75

Step-by-step explanation:

1 dollar for every 1 ticket.

~~~~~~~~~~~~~~~~~~~~~~~~~~~`

Hope I helped!!!

GL :)

Answer: 75 the other guy is correct

Step-by-step explanation:

HELP HELP PLEASE!! D:
Determine the missing side length!!
PLEASE NO CAP!!

Answers

Answer:

missing side length = 9

Step-by-step explanation:

[tex]c^{2} = a^{2} + b^{2}[/tex]

a = 6

b = 7

c = missing side

[tex]c^{2} = 6^{2} + 7^{2}[/tex]

[tex]c^{2} = 36 + 49[/tex]

[tex]c^{2} = 85[/tex]

[tex]\sqrt{c^{2} } = \sqrt{85}[/tex]

[tex]c = 9.219 = 9[/tex]

What is:
(9t+5)+(3t-6)
simplified?

Answers

Answer:

12t - 1

Step-by-step explanation:

(9t+5) + (3t-6)

9t + 5 + 3t - 6

12t - 1

Hellohello, if you able to help me then please do. (:

Answers

Answer:

g=12

Step-by-step explanation:

3 + g = 15

g = 15-3

g = 12

Answer: g = 12 would make the equation into a true number sentence.

Steps:
3 + g = 15
g = 15 - 3
g = 12

Check:
3 + g = 15
3 + 12 = 15
15 = 15 ✅

Brainliest???

IM GIVING 20 POINTS
What is the area of a square with side lengths of 3/5 units?

15/15

9/25

6/10

3/5

Answers

Answer:

you get 9/25

Step-by-step explanation:

formula for area of square

=s^2

plug in

3/5^2

calculate

you get 9/25

Hey there!

To find the area of a square, multiply the side length by itself, also known as sqaring the side length.

We must solve 3/5 x 3/5.

3/5 x 3/5 = 0.36

The units we'll use is  because units are the unt we're given, and it is squared because it is the area of a shape.

Your final answer is 0.36 .

Hope this helps!

Solve the equation:

3/4x = 12

Enter the answer in the box. Enter your numerical answer in the box, do not include words or spaces.

Answers

Answer:

3/4x=12

3=4x*12

3=48x

3/48x=1/16

x=1/16

I need help on this question I got 145.13 but i dont know what I did wrong

Answers

Answer:

145.12

Step-by-step explanation:

3.14 * 16 / 2 + 120

I basically got the same answer

A helicopter flew north 325 meters and then flew east 500 meters. How far is the helicopter from its starting point?

Answers

Answer:

596.34m approx

Step-by-step explanation:

Given data

Let the Starting point be x

A helicopter flew north 325 meters from x

Then flew east 500 meters

Let us apply the Pythagoras theorem to solve for the resultant which is the distance from the starting position

x^2= 325^2+500^2

x^2=105625+250000

x^2= 355625

x= √355625

x=596.34m

Hence the distance from the starting point is 596.34m approx

Other Questions
Testbank Multiple Choice Question 110 On January 1, 2021, Marigold Corp. redeemed its 15-year bonds of $6920000 par value for 101. They were originally issued on January 1, 2009 at 91 with a maturity date of January 1, 2024. Marigold amortizes discounts and premiums using the straight-line method. What amount of loss should Marigold recognize on the redemption of these bonds (ignore taxes) In the Holy Land, water is needed for which of the following reasons? quiero 32 executive y un cuarto mas de evening porfabor nesesito mucha ayuda helpWhat is an equation of the line that passes through the points (-4, 4) and (8.1)? what is the answer to (8+10) x1/2 = Your friend Alex has won a scholarship to study abroad. (Congratulations!) Alex has only 8 weeks to earn enough money to buy a plane ticket, and he wants to work at an amusement park over the summer to acheive this goal How did the US claim Florida? Who owned Florida in the first place? Why did they give up the land to the US? Which actions of a pharmacy technician would protect patient privacy? Select all that apply.logging in with a passwordchecking personal emailsaving and backing up patient informationlearning new softwarechecking a social network site Use the sentence to complete the activity.Jessica ate the cookies that her daughter baked for her.In one to two sentences, identify the bold words as an independent clause, dependent clause, or phrase, and explain their functions within the sentence. A golf course has 18 holes. A guidebook provided to golfers includes useful information about each hole, as shown below. A 4-column table with 6 rows. Column 1 is labeled hole number with entries 1, 2, 3, 4, 5, 6. Column 2 is labeled yards with entries 312, 530, 147, 350, 410, 185. Column 3 is labeled bunkers with entries 2, 5, 1, 0, 2, 1. Column 4 is labeled difficulty level with entries moderate, moderate, easy, moderate, hard, moderate. What are the individuals in this data set? holes yards bunkers difficulty levels what are the disadvantages of bartering Can someone help me please what are some causes of high unemployment in a country? The diagram below shows a rectangle inside of a regular hexagon. the apothem of the hexagon is 17.32 units. to the nearest square unit, what is the area of the shaded region? A triangle has a perimeter of 13x-21 units. One side is 4x+3 units. The other side is 5x-8 units. Write an expression to find the missing side. When a lift is accelerating downward that a=g then the net force acting on the object is: (a)F=0N (b)F=mg (c)F=w-mg (d) F=w_ma does anyone know any of these? Ukraine occupies Europe's_______center.ill mark the person who answers it first Complete each sentence with the correct form of the verb in parentheses. Determine whether the equation is true or false.