Engineering
Which of the following are the steps for the Gram Stain procedure, in order?A) Place the bacterial sample on a slide, add crystal violet, add iodine, add decolorizer, add safranin.B) Place the bacterial sample on a slide, add iodine, add crystal violet, add decolorizer, add safranin.C) Place the bacterial sample on a slide, add crystal violet, add safranin, add decolorizer, add iodine.D) Place the bacterial sample on a slide, add safranin, add decolorizer, add iodine, add crystal violet.E) Place the bacterial sample on a slide, add decolorizer, crystal violet, add safranin, add iodine.
The following sequence of the operations is performed on a stack PUSH(10), PUSH(20), POP, PUSH(10), PUSH(20), POP, POP, POP, PUSH(20), POP the sequence of values popped out isA. 20,10,20,10,20B. 20,20,10,10,20C. 10,20,20,10,20D. 20,20,10,20,10
3. a. For the system of prelab 2a, calculate the values of a and b so that the real part of the poles remains the same but the imaginary part is increased 2 times over that of prelab 2a and repeat prelab 2a. b. For the system of prelab 2a, calculate the values of a and b so that the real part of the poles remains the same but the imaginary part is increased two times over that of Prelab 2a, and repeat Prelab 2a.(Do 3a and 3b)2. Given the transfer function G(s) 52 + as + b a. Evaluate percent overshoot, settling time, peak time, and rise time for the following values: a =4, b=25. Also, plot the poles. b. Calculate the values of a and b so that the imaginary part of the poles remains the same but the real part is increased two times over that of Prelab 2a, and repeat Prelab 2a. c. Calculate the values of a and b so that the imaginary part of the poles remains the same but the real part is decreased time over that of Prelab 2a, and repeat Prelab 2a.