Imagine you are a doctor running behind schedule due to the needs of a patient in the morning. This has backed up all your other appointments for the day and has led to several grumpy and rude patients. How do you balance being a good listener and providing solid care with the logistics of the day?

Answers

Answer 1
By helping those who actually need emergency services and then afterwards go along with the others
Answer 2

The best way to balance being a good listener and providing solid care with the logistics of the day is to:

Get a competent assistant that you can delegate some work to:

A doctor is a person who takes care of the sick, injured or afflicted and prescribes drugs to them after careful medical examination and diagnosis.

As a result of this, we can see that there is a lot of work to be done by a doctor who is behind schedule and has to attend to grumpy and rude patients, while being a good listener.

The best solution is to get a competent assistant you can share the work with so that the work load would reduce and you would be more efficient.

Read more here:

https://brainly.com/question/13577529?source=archive


Related Questions

a neurosurgeon has drilled a hole through her patiens skull and is preparing to remove glioma. list in order the membranes she must cut through to reach the cerebral cortex

Answers

1) dura mater

2) arachnoid mater

3) pia mater

A neurosurgeon has drilled a hole through her patients skull and is preparing to remove glioma. list of the membranes she must cut through to reach the cerebral cortex are

1) Dura mater

2) Arachnoid mater

3) Pia mater

What is Arachnoid mater?

Arachnoid mater: Linked to the dura mater on the side closest to the CNS, this intermediate layer contains a network of fibers and collagen that exists as part of the suspension system that permits the rescue of the brain and spinal cord from sudden impact.

Three layers of membranes understood as the meninges rescue the brain and spinal cord. The delicate inner layer is named the pia mater. The middle layer is named the arachnoid. It exists a web-like structure filled with fluid that cushions the brain. The tough outer layer exists called the dura mater.

To learn more about Arachnoid mater refer to:

https://brainly.com/question/11877117

#SPJ2

why do people sneeze a lot at a time

Answers

Answer:Researchers aren't sure why some people sneeze multiple times. It may be a sign that your sneezes aren't quite as strong as a person who only sneezes once. It could also be a sign that you have ongoing or chronic nasal stimulation or inflammation, possibly as a result of allergies.

Explanation:

Answer: because of allergies

Order: ABC 625 mg. Stock: ABC 780 mg/2

mL. How many ml(s) will you give? (round the

answer to the nearest tenth)

Select one:

a. 0.8 mL

b. 2.5 mL

c. 1.6 mL

d. 1.2 mL

e. None are correct

Answers

Answer:

c. 1.6 mL

Explanation:

625mg/x mL = 780mg/2mL, cross multiply

1250 = 780x, divide both sides by 780

x = 1.60

Organs form different systems that carry out distinct body processes.

Which body system is responsible for the mentioned function?

The
system consists of the heart and blood vessels. Its main function is to
blood.

Answers

Cardiovascular system. It’s main function is to pump blood.
Hope it helps. Please mark as brainliest

Answer:

Cardiovascular and transport

Explanation:

What must occur after a meeting concludes?
O A. following up on the decided action items
O B. writing the minutes of the meeting
O C. planning the action points
OD.
deciding on the agenda of the meeting
Reset

Answers

Answer:

b

Explanation:

im not sure if this is correct

B writing the minutes of the meeting

Danielle is a health information technician at a small local hospital. Which step can best help her progress in her career?

A.
improving her speaking and listening skills
B.
helping her colleagues at every opportunity and working longer hours
C.
getting a certification from the Occupational Safety and Health Administration (OSHA)
D.
getting a certification from the American Health Information Management Association (AHIMA)

Answers

Answer:

D will make her more marketable.

Explanation:

How many sensory signals do trigeminal nerves receive from the face

Answers

Answer:

2

Explanation:

Answer:

The trigeminal nerve.

Explanation:

is a nerve responsible for sensation in the face and motor functions such as biting and chewing; it is the most complex of the cranial nerves. You receive five sensory signals.

1. Temporal branch.

2. Zygomatic branch.

3. Buccal branch.

4. Marginal mandibular branch.

5. Cervical branch.

At a recent visit, Dr. Shah told Anne that she will need to have her appendix removed. Anne feels nervous because she knows very little about the procedure, or what to expect during recovery. Dr. Shah, wants to put her patient at ease.

Think about verbal communication skills, nonverbal communication skills, and active listening skills that Dr. Shah can use. Write a short dialogue describing the ideal interaction between Anne and Dr. Shah. You may use the Internet to research further examples of these communication skills.

After conducting your research, write a paragraph describing the techniques used in the dialogue.

Answers

Answer:

Anne: “The thought of having my appendix removed really scares me. I’ve never had any kind of surgery before.”

Dr. Shah [puts down clipboard and pen]: “I understand how you are feeling, Anne. It can definitely be scary to go into an unknown situation. Let’s talk about the procedure, okay? What would you like to know?”

Anne: “I’m worried about the anesthesia. What is that like?”

Dr. Shah [maintains eye contact with Anne]: “We have a great team of anesthesiologists. They will talk to you before your surgery so that you feel comfortable. Going under anesthesia feels a lot like falling asleep. The anesthesiologist will ask you to count down from ten. You will gently fall asleep, and when you wake up the surgery will be over. Does that information help you?”

Anne: “Yes, definitely. I guess I’m worried about what I’ll feel like after the surgery, too. I’m so busy with work and school. Will I be in a lot of pain?”

Dr. Shah [places her hand on Anne’s shoulder]: “I know that work and school matter a lot to you, and you do a great job with both. Our goal is to get you back on your feet as soon as possible. Our team will help you manage the pain, and you’ll be feeling better within just a few days. I’m also happy to write a note to your professors and your employer so that they understand why you might be out for a little while.”

Anne: “That would be great, Dr. Shah. Thank you. Is there anything else I should know?”

Dr. Shah: “You’ll want to ask a friend or family member to drive you home from the hospital, and you’ll also want to refrain from eating anything twelve hours before the surgery. If you think of any other questions, you can call my office at any time!”

Dr. Shah helped put her patient, Anne, at ease by using active listening. She paid close attention to what Anne said and did not interrupt or try to dismiss Anne’s concerns. Dr. Shah focused on Anne’s words and confirmed her comprehension with statements like “I understand how you are feeling.” Dr. Shah made sure her feedback was helpful by following up with questions like “Does that information help you?” Dr. Shah showed genuine care for her patient and listened to what was not being said, too. Anne expressed concern about work and school but did not say why. Dr. Shah used her listening skills to determine that Anne was worried about getting in trouble for missing class or work, so she volunteered to provide written notes. Dr. Shah made Anne feel comfortable and responded both verbally and nonverbally. The doctor’s eye contact and hand gestures probably made Anne feel understood and that her questions were valid.

Explanation:

Select all the correct answers.
Which three health professionals are fulfilling their responsibilities as a leader?
Dr. Hilda refuses to work if her favorite nurses are not part of the surgical team.
Nora trusts her team's work ethic and leaves them to finish their tasks and report back.
n
Sam calls his team to explain how to use the new autoclave sterilizer.
Mohit has been too busy for several weeks to meet with his team members.
Naina has a team meeting to discuss how they can comply better with the regulations.
Reset
Next

Answers

nora trusts her teams work ethic and leaves them to finish their tasks and report back.

same calls his team to explain how to use the new autoclave sterilizer.

naina has a team meeting to discuss how they can comply better with the regulations.

Write a paragraph describing what you know about cancer.
How it progresses
the end result for some
type of cancer
Most amazing gets brainiest and 5 stars and a thanks
2nd one gets thanks and 5 stars
Need it in next 20 mins Plz

Answers

Answer:

Fatigue (extreme tiredness) and Weakness

As your cancer progresses, you may become more fatigued. You may not be able to do all of your normal activities. It is ok to do less activity and to rest more often. Eventually, you might need to rest most of the time with very little activity.Cells are the basic units that make up the human body. Cells grow and divide to make new cells as the body needs them. Usually, cells die when they get too old or damaged. Then, new cells take their place.

Cancer begins when genetic changes interfere with this orderly process. Cells start to grow uncontrollably. These cells may form a mass called a tumor. A tumor can be cancerous or benign. A cancerous tumor is malignant, meaning it can grow and spread to other parts of the body. A benign tumor means the tumor can grow but will not spread.

Some types of cancer do not form a tumor. These include leukemias, most types of lymphoma, and myeloma.er

Doctors divide cancer into types based on where it begins. Four main types of cancer are:

Carcinomas. A carcinoma begins in the skin or the tissue that covers the surface of internal organs and glands. Carcinomas usually form solid tumors. They are the most common type of cancer. Examples of carcinomas include prostate cancer, breast cancer, lung cancer, and colorectal cancer.

Sarcomas. A sarcoma begins in the tissues that support and connect the body. A sarcoma can develop in fat, muscles, nerves, tendons, joints, blood vessels, lymph vessels, cartilage, or bone.

Leukemias. Leukemia is a cancer of the blood. Leukemia begins when healthy blood cells change and grow uncontrollably. The 4 main types of leukemia are acute lymphocytic leukemia, chronic lymphocytic leukemia, acute myeloid leukemia, and chronic myeloid leukemia.

Lymphomas. Lymphoma is a cancer that begins in the lymphatic system. The lymphatic system is a network of vessels and glands that help fight infection. There are 2 main types of lymphomas: Hodgkin lymphoma and non

As a cancerous tumor grows, the bloodstream or lymphatic system may carry cancer cells to other parts of the body. During this process, the cancer cells grow and may develop into new tumors. This is known as metastasis.

One of the first places a cancer often spreads is to the lymph nodes. Lymph nodes are tiny, bean-shaped organs that help fight infection. They are located in clusters in different parts of the body, such as the neck, groin area, and under the arms.

Cancer may also spread through the bloodstream to distant parts of the body. These parts may include the bones, liver, lungs, or brain. Even if the cancer spreads, it is still named for the area where it began. For example, if breast cancer spreads to the lungs, it is called metastatic breast cancer, not lung cancer.

Watch a brief video about how cancer begins and spreads to other parts of the body.

Explanation:

pls brain list



Select the correct answer.
What does positive identification in comparative dental identification indicate

Answers

Positive identification refers the similarity of the opinion about antemortem and postmortem data.

What is Positive Identification?

The antemortem and postmortem data that is match in sufficient detail to make the opinion that they are from the same individual is known as positive identification so we can conclude that positive identification refers the similarity of the opinion about antemortem and postmortem data.

Learn more about identification here: https://brainly.com/question/26320301

Answer:

Lack of evidencce

Explanation:

The aorta is the most muscular and largest artery in the circulatory system. Its structure is directly related to its function of ______.

Answers

Answer:

delivering a large volume of high-pressure blood to the body.

                                     or in my words

transporting a large capacity of blood to the whole body.

Explanation:

Directions: Choose the letter of the best answer Witte the letter of your
answer on a separate sheet of paper.
Where does digestion start?
B. mouth
stomach
D. small intestine
2. Which part of the mouth physically breaks down the food into smallerpleces?
A teeth
B. saliva
C. tongue
D. salivary eland
3. Through which opening of the body do the feces leave out?
A. anus
B. rectum
C. large intestine
D. small intestine
4. Why is it important to chew your food properly?
A. To prevent diarrhea
B. To become constipated
C. To prevent dehydration
D. To prevent choking and Indigestion
5. How should you take care of your digestive system?
A. Eatjunk foods more often.
B. Eat too much spicy and fatty foods.
C. Eat candies and chocolates before meals.
D. Eat foods rich in fiber to regulate bowel movement.
6. What is the process of breaking up and dissolving food so that it can be
absorbed by the body?
A. circulation B. digestion
C. excretion
D. respiration
7. What is the role of the large intestine in the digestion process?
A. It produces insulin.
B.It absorbs some of the water and salts.
C. It secretes enzymes that digest proteins.D. It serves as a temporary storage of food and water.
8. How does the small intestine help in the digestion process?
A. It acts as temporary storage of food.
B. It helps in the physical digestion of food.
C. It allows the movement of food down to the stomach.
D. It allows the final digestion and absorption of nutrients to the rest of the body.​

Answers

Answer: B

Explanation: I know it starts in the mouth because the mouth is very absorbent and often put pills under your tongue. Its absorption is equal to an I.M. injection.  

1. B
2. A
3. A
4. D
5. D
6. B
7. B
8. D

Montee has not been feeling well for a few weeks. He has been coughing frequently. His cough regularly produces mucus, but sometimes it also contains blood. Montee has been very tired and feverish, often waking in the middle of the night because he is warm and sweating profusely. After considering his symptoms, what disease do you think Montee has?

Answers

The symptoms and signs that Monte has been experiencing are typical for tuberculosis.


( Tuberculosis is an Infectious disease caused by Mycobacterium tuberculosis. It is treated with the combination of antibiotics. )

PLEASE HELP ASAP!!!
Jenna is interested in veterinary science. Her guidance counselor is laying out a course of classes that might help Jenna along her education path. When she looks at the counselor’s suggestions, Jenna balks. She does not understand why she would need to study chemistry to be a vet. Can you predict the MOST likely outcome if Jenna does not study chemistry before she becomes a veterinarian?

Jenna will get by just fine since there is no need for veterinarians to understand chemistry.

Jenna will be limited from going into research, but it will not have any effect if she becomes a small animal veterinarian.

Jenna will not understand how to perform emergency surgery on an animal in need of help.

Jenna might not be able to clearly explain how a drug will work to help treat an animal’s illness or disease.

Answers

Answer:

Jenna might not be able to clearly explain how a drug will work to help treat an animal's illness or disease.

Explanation:

Chemistry is important especially because you need to know how a drug works or whats the medicine containing.

Sometimes physicians place a catheter called a central line, that leads directly to the heartThis vein sits below the clavidle. What is the name of this vein?

A-Brachial
B-Subclavian
C-Radial
D-jugular

Answers

Answer:

B) Subclavian

Explanation:

I hope this helps :) Tell me if I am wrong.

B) Subclavian would be your answer

Overall, piaget _____ infant'a and children's cognitive abilities, but ____ those of adolescents

Answers

Answer:

underestimated; overestimated.

Elisa injured her lower back while lifting a child at work. She now has pain and numbness, and muscle weakness in her left leg. Which surgical procedure will the doctor perform to treat Elisa’s herniated intervertebral disk?
A.
meniscectomy
B.
laminectomy
C.
fasciotomy
D.
ostectomy
E.
spondylosyndesis

Answers

Answer:

A

Explanation:

Complex diseases are caused by imperfections in multiple genes.

Answers

Answer:  yep, it is True!

The given statement is correct that complex diseases are caused by imperfections in multiple genes.

Polygenic disorders are caused by the interaction of multiple genes, as well as environmental factors. These imperfections are called polygenic disorders.

Single-gene disorders are caused by mutations in a single gene..

Complex diseases, on the other hand, are caused by the interaction of multiple genes. This means that there is no single gene that can be identified as the cause of the disease.

Examples of complex diseases include cancer that is a complex disease that is caused by a combination of genetic and environmental factors.

Environmental factors that can contribute to complex diseases include a diet high in saturated fat and cholesterol can increase our risk of heart disease and tobacco use is a major risk factor for many complex diseases, including lung cancer, heart disease, and stroke.

Hence, the given statement is correct.

Learn more about disorders here;

https://brainly.com/question/34308708

#SPJ6

Which component of OBRA indicates the active or inactive status of a nursing assistant?
Ο training requirements
O a competency evaluation
O the nursing assistant registry
O yearly training

Answers

Answer:

C. the nursing assistant registry

Explanation:

Nursing process can be defined as a scientific technique used by nurses as a systematic problem-solving guide to provide nursing care to patients such as maintenance of patient safety, patient functionality and satisfaction.

The following are the steps of the nursing process in an appropriate order; Assessment, Diagnosis, Planning, Implementation and Evaluation.

OBRA is an acronym for Omnibus Budget Reconciliation Act and it is also called the Nursing Home Reform Act of 1987. OBRA defines the federal standards on how health care should be given to home patients (residents) and ensures that they receive quality treatment or care at all times.

In the United States of America, OBRA is interpreted by the U.S. Code of Federal Regulations.

The component of OBRA which indicates the active or inactive status of a nursing assistant is the nursing assistant registry. A nursing assistant is a certified health care provider but is only permitted to provide services under the supervision of a professional nurse.

The nursing assistant registry comprises of all active nursing assistant qualified to work and inactive nursing assistant who aren't qualified yet to work.

Pulmonary Trunk splits in two directions to carry deoxygenated blood from the Right Ventricle of the heart to the Lungs for oxygen pickup What are ese blood vessels called?

Answers

Answer:

Veins.

Explanation:

The pulmonary trunk splits into the right and left pulmonary arteries. These arteries transport the de-oxygenated blood to arterioles and capillary beds in the lungs. There, carbon dioxide is released and oxygen is absorbed. Oxygenated blood then passes from the capillary beds through venules into the pulmonary veins.

Amir, who works as a nurse, has recently become a clinical informaticist. Which two additional responsibilities will he most likely take on?

help plan the financial budget for the year
help create a new system for ordering medicines
help improve the documentation and maintenance of nursing care plans
help develop new techniques for diagnosing illnesses
guide nurses on maintaining electronic patient records correctly

Answers

Answer:

help improve the documentation and maintenance of nursing care plans

help develop new techniques for diagnosing illnesses

Question #7 Multiple Choice If a patient is in the supine position, what would he need to do to be in an anatomical position? turn over on the stomach stay in the same position but move upright with palms forward sit with the head straight and the feet on the floor turn to the side and stand straight​

Answers

Answer:

He would need to stay in the same position but move upright with his palms forward.

Explanation:

The anatomical position is known as "sanding up straight with palms forward". We also know that the supine position is laying down face up. So, all the patient would need to do is stay in the same position but move upright and turn his palms face up.

The somatic nervous system allows you to perform voluntary
actions because many of it's nerves connect to____
muscles, the muscles primarily involved in movement

Answers

Hii!! I believe the answer might be skeletal. Hope this helped!

A patient suffering from hirsutism goes to a doctor for treatment. Which treatment should the doctor use to treat her condition?
A.
surgery
B.
antibacterial medication
C.
laser treatment
D.
biopsy
E.
a topical treatment

Answers

Answer:a

Explanation:

Because he can take it out

A topical treatment.

My first choice would’ve been a laser treatment since hirsutism is excess hair growth but after researching for a little bit I found out that most doctors prescribe a topical cream.

What month does a fetus begin to store nutrients such as iron for blood and calcium for bones ?

Answers

Month 3 of the pregnancy

what is greater 30% 0f 90 or 35%of 80

Answers

35% of 80 because it’s more of the 80% than the 30% of 90
That’s is a great answer

The digestive system and the excretory system both excrete waste.

Which best describes how waste is secreted in each system?

The digestive system excretes a liquid waste and the excretory system excretes a solid waste.
Both systems excrete waste as a liquid.
Both systems excrete waste as a solid.
The digestive system excretes a solid waste and the excretory system excretes a liquid waste.

Answers

Answer:

The answer is (D)

The digestive system excretes a solid waste and the excretory system excretes a liquid waste

Explanation:

Answer:

its d

Explanation:

your welcome lol :]

By asking the victim if he or she is okay and if you can help is demonstrating?

a. implied consent
b. being a good person
c. a nice thing to say
d. informed consent

Answers

It’s a by agreeing to allow disclosure of private health
Being a good person
Other Questions
(-15,-6), (8,3) Find the slope of the line through each pair of points? Use what youve read in the passage to answer this question.In this article about extreme travel destinations, the writer chose to include these three places because they share certain general qualities. Write a list of qualities shared by these places. Use evidence from the text and your own ideas to support your list. HELP Which feature of Gothic writing does this passage from Nathaniel Hawthorne's The Scarlet Letter most illustrate? A.Human MadnessB. The supernaturalC. Death and MortalityD. Nature's Power What is the name of the chemical the body produces to help in time of challenge? giving brainliest and a lot of points!1. All living things depend on______2. What are the connections between living things called?3. No matter what food we talk about, it can always be tied back to _______4. How are the different parts of a chicken sandwich connected to plants? a. Bread is made of which is a plant _______b. Lettuce is a _______c. What do chickens eat, which is a plant?d. Tomatoes come from5. Decomposers put important ______ back into the soil for ______ to use.6. Plants make good _____and good _____7. Where do most plants grow?8. What do plants need to grow? Marcus needs 550 tickets to get the prize he wants at the arcade. He already has 125 tickets and can earn 24 tickets each time he plays an arcade game. How many games will he have to play in order to have enough tickets to win the prize he wants? (iReady) Why is it important touse a web host?A. To help you get good ideas for podcast titles.B. So more people can listen to your podcast.C. To help make your podcast more interesting.D. So you can find a cover for your podcast. how does the government have power? during replication, and theIn a strand of DNA the sequence should read: TACGCGTCA. A mistake was madesequence ended up reading TACGCCTCA. What kind of mutation was this?LPnone of the abovedeletionsubstitutioninsertion A person is standing on a level floor. His head, upper torso, arms, and hands together weigh 458 N and have a center of gravity that is 1.34 m above the floor. His upper legs weigh 120 N and have a center of gravity that is 0.766 m above the floor. Finally, his lower legs and feet together weigh 89.8 N and have a center of gravity that is 0.204 m above the floor. Relative to the floor, find the location of the center of gravity for the entire body. How can i state whether each graphs represents a function? Which principle of government says that the federal government and state government share powers?A. FederalismB. Checks and BalancesC. Individual Rights Pls help pls pls pls Which are problems faced by the newly independent nations of Africa? Select all that apply.corrupt governmentsAIDSfamineeconomic problems Neville Chamberlain decided to act as a _ Name the city located at 38S , 145E. 002 (part 1 of 2) 10.0 points For :393 g of butadiene (C,11,) calculate the number of moles. Answer in units of mol. Question 44 ptsYou roll 2 fair 6-sided dice. What is the probability of rolling a sum of 7 or more?18/36 or 1/220/36 or 5/919/3921/36 or 7/12 What is one advantage of developing energy-efficient technologies? Escoge la mejor repuesta, segun el contexto. sale y ____valesalepenaonda